Nutriciab - Arrivé Bellané, France 2024

Handover: February 2023
Commencement: 18.1.2024
Completion: 5.2.2024
Power: 0.5 MW
950 Panels
320 screws
A second project for Électricité de France in 2024. A PV plant has been built on an agricultural site near the Atlantic coast in the Pays de la Loire region. The second project this year was also completed in a very good time thanks to our 2V Slide-in construction, which continues to prove to be a fast and reliable option. The number of obstacles on the site also necessitated different design solutions, but this is nothing that would pose a problem for us.










