PASQUIER – Arras, France, 2026

Implementation:
Output: 0,9 MW
2V design on ground screws
A standard installation featuring a tried-and-tested 2V design on the Normandy coast, incorporating bridging of the structural foundations where utility networks are present – a quick solution for similar construction sites.