PASQUIER – Arras, France, 2026

Implementation:

  • Output: 0,9 MW

  • 2V design on ground screws

A standard installation featuring a tried-and-tested 2V design on the Normandy coast, incorporating bridging of the structural foundations where utility networks are present – a quick solution for similar construction sites.